20% OFF CODE: WELCOME2020% off with code WELCOME20Explore All Systems →
Home/Tools/Janitorial Bid Calculator

Janitorial Bid Calculator for Commercial Cleaning

Price an office, clinic or retail cleaning contract from the ground up: square footage, production rate, visits, wages, supplies and overhead. Get the monthly bid, price per visit and price per square foot, then download it as Excel.

Load Preset:

Building & Labor Inputs

Floor area cleaned each visit.

Routine office: ~2,000–4,000. Medical and restroom-heavy sites are slower.

Nightly weekday service = 5.

Base pay before taxes.

Payroll taxes, workers comp, benefits.

Chemicals, liners, paper, equipment wear.

Insurance, supervision, vehicles, office.

Share of the final price kept as profit.

Bid Summary
Monthly Bid
$673.50
Price per Visit
$51.81
Hours per visit:1.67 h
Labor hours per month:21.7 h
Labor cost (with burden):$442.00
Supplies:$26.52
Overhead:$70.28
Total monthly cost:$538.80
Monthly profit:$134.70
Price per sq ft per month:$0.135
Effective billing rate:$31.08 / h

Free, no signup. Live formulas you can reuse for every account.

Official Excel System
$7.20$9-20%

Commercial Cleaning Bid Calculator & Contract Tracker

Bid multiple buildings, track signed contracts, crew hours and margin per account in one macro-free Excel workbook.

100% Macro-Free (.xlsx) • Native dynamic formulas
Single-user perpetual license • Zero monthly SaaS
Pre-filled demo workbook + Clean blank sheet
Instant .xlsx Download • Verified IT Safe • Polar Secured

How to Bid a Commercial Cleaning Job

  1. Measure the cleanable area during the walkthrough and note restrooms, break rooms and hard floors that slow the crew down.
  2. Pick a production rate. Hours per visit = square feet ÷ sq ft per hour. 5,000 sq ft at 3,000 sq ft/hour is 1.67 hours.
  3. Convert to monthly labor. Visits per month = visits per week × 4.33. Multiply hours by the wage plus labor burden.
  4. Add supplies and overhead as percentages so they scale with the size of the job.
  5. Apply margin on price, not cost. Monthly bid = total cost ÷ (1 − margin). A 20% margin on $1,000 of cost is a $1,250 bid, not $1,200.
Monthly bid = (Labor × (1 + burden) + supplies + overhead) ÷ (1 − profit margin)